banner
Product
  • Phone

    86-532-80900086

  • Address

    Zhuliu Industrial Park, Changle County, Weifang, Shandong, China

  • E-mail

    k@waimaotong.com

LatestProducts
2017 Cheap Prefab Worker Camp for Coal Mining Area

2017 Cheap Prefab Worker Camp for Coal Mining Area

China 2017 Cheap Prefab Worker Camp for Coal Mining Area, Find details about China Prefa House, Modular House from 2017 Cheap Prefab Worker Camp for Coal Mining Area - Shandong Wecheer Green Building Technology Corp., Ltd.

Description

Basic Info
  • Model NO.: K-02
  • Standard: GB, ISO9001,Ukas,SGS,Cnas,Iaf
  • Forming: Hot-Rolled Steel
  • Member: Steel Beam
  • Carbon Structural Steel: Q235
  • Application: Steel Fabricated House, Steel Walkway and Floor, Steel Structure Bridge
  • Brand Name: Wecheer
  • Material: Main Steel Structure with EPS Sandwich Panel
  • Steel Column: C Section Steel and Square Tube
  • Wall and Roof Purlin: Fabricated by C80 C100 C120 C140
  • Flooring: 18mm Plywood+1.5PVC Leather
  • Origin: China
  • Type: Light Section Steel
  • Trademark: Special Purpose Steel, wecheer
  • Connection Form: Welded Connection
  • Type of Steel For Building Structure: High-Strength Steel
  • Residential Wall Structure: Wallboard
  • Place of Origin: Weifang City,Shandong Province
  • Model Number: K-01
  • Use: Worker Camp,Meeting Room,Kitchen,Warehouse,Villar
  • Main Triangle Beam: Fabricated by C80 C100 C120 C140
  • Wall and Roof Panel: 50mm 75mm 100mm 150mm Steel Sandwich Panel
  • Transport Package: Shipping Container
  • HS Code: 9406000090
Product Description
General technical description for standard prefabricated house worker camp

Technical Parameter:

Technical Parameter of standard prefabricated house:
1. Wind resistance: Grade 11(wind speed≤ 120km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.6kn/m2
4. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
5. Second Floor Load Capacity: 150 kg/m2
6. Live load of corridor is 2.0kn/ m2
7. Wall permitted loading: 0.6KN/ m2
8. Ceiling Permitted live loading: 0.5 KN/m2
9. Wall Coefficient of thermal conductivity: K=0.442W/m2k
10. Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K

Steel framework

Main column: Fabricated by 80*80 or 100*100 or 120*120 or 150*150 Square Tube, Q235 Steel Surface working: Alkyd painting, two primary and two surface.

Main triangle Beam: Fabricated by C80, C100, C120, C140 Section steel, Q235 Steel, Surface working: Alkyd painting, two primary and two surface.

Wall and roof purlin: C80, C100, C120, C140 Section steel, Q235 Steel,
Surface working: Galvanized


Floor

Groud floor will be the concrete foundation with Ceramic tiles or PVC floor leather.
First floor: 18mm plywood with 2.0mm PVC floor leather for living rooms floor;

Ceiling

Construction:
6mm Gypsum board for dry room
12mm PVC ceiling for wet room

Walls


Insulated Steel Sandwich Panel wall
Panel width: 950mm;
Thickness: 50-120mm.
Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm
Insulation: Polystyrene, Rockwool or Polyurethane
Density of Rockwool: 120Kg/m3
Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3
Density of Polyurethane: 40Kg/m3

Door

External door: Insulated with opening dimension 950*2100mm, furnished with lock
With 3keys. Inner door: Insulated steel door.

Windows

Window material: PVC window with fly screen, 4mm glass.

Electrical fittings option

Electrical wire, 2.5mm2 for lighting system, and 4mm2 for AC units.
16A five hole universal socket.
Double tube fluorescent lamp, 220V, 50-60HZ
Single Switch, Honyar brand, with junction box
Electrical distribution box, box+breakers+earth leakage protective device

Optional Water system fittings

Water drain pipe, PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years.
Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC

Sanitary ware:
Western Close tool: Ceramic, with pipes and installation fittings
Urinal: Ceramic, with pipes and installation fittings
Wash basin: Ceramic, with post, faucet, pipes and installation fittings
Shower head, Shower base, Water mixture


Why Choose Prefabricated house for Site Camp Solution? There are many advantages to modular camp construction for site camps including:



1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!



2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical



3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.



4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.



5. Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)

Related Products